What was found
DURING SCHEDULED MV2 CHECK, FOUND FUSELAGE SHEAR TIE CRACKED AT BS 380, STR 17L. REPAIRED SHEAR TIE PER SWA EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED MV2 CHECK, FOUND FUSELAGE SHEAR TIE CRACKED AT BS 380, STR 17L. REPAIRED SHEAR TIE PER SWA EA.