What was found
DURING SCHEDULED 1/4D CHECK, FOUND VERTICAL BEAM WEB CORRODED BETWEEN BS 767 TO BS 787, STR 25R TO STR 26R. REMOVED AND REPLACED WEB SECTION PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/4D CHECK, FOUND VERTICAL BEAM WEB CORRODED BETWEEN BS 767 TO BS 787, STR 25R TO STR 26R. REMOVED AND REPLACED WEB SECTION PER SRM.