What was found
DURING SCHEDULED 16Y CHECK, FOUND CREASE BEAM CORRODED BETWEEN BS 320 AND BS 338, LBL 70. REPAIRED CREASE BEAM PER SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 16Y CHECK, FOUND CREASE BEAM CORRODED BETWEEN BS 320 AND BS 338, LBL 70. REPAIRED CREASE BEAM PER SRM.