What was found
DURING SCHEDULED SPV CHECK, EEPLS FAILED OPERATIONAL CHECK. CHARGED BATTERIES PER MT.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SPV CHECK, EEPLS FAILED OPERATIONAL CHECK. CHARGED BATTERIES PER MT.