What was found
DURING SCHEDULED OTS CHECK FOUND, AFT PRESSURE BULKHEAD WEB CRACKED AT LOWER EDGE OF PIE PANEL AT 12 O'CLOCK IN AND OUT OF FASTENER RIGHT ABOVE DOME PLUG BS 1016. REPAIRED WEB IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED OTS CHECK FOUND, AFT PRESSURE BULKHEAD WEB CRACKED AT LOWER EDGE OF PIE PANEL AT 12 O'CLOCK IN AND OUT OF FASTENER RIGHT ABOVE DOME PLUG BS 1016. REPAIRED WEB IAW SRM.