What was found
RIGHT HORIZONTAL STAB RIB CRACKED AT HSS 92.7, BOTTOM OF 2 STIFFENER FROM TRAILING EDGE. REPAIRED THE RIB IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RIGHT HORIZONTAL STAB RIB CRACKED AT HSS 92.7, BOTTOM OF 2 STIFFENER FROM TRAILING EDGE. REPAIRED THE RIB IAW SRM.