What was found
RIGHT HAND MAIN LANDING GEAR FORWARD BULKHEAD AT B.S. 540 VAPOR BARRIER CRACKED IN TWO (2) LOCATIONS. / PERFORMED INTERIM REPAIR PER REPAIR 57 EA-07683 FOR FURTHER CORRECTIVE ACTION REF 943 & #V005123 / REPETITVE ACTION REQUIRED: / REMOVE ALUM FOIL TAPE AND PERFORM DETAILED VISUAL INSP OF THE CRACK FOR ANY ADDITIONAL DAMAGE OR GROWTH. IF ADDITIONAL DEFECTS ARE NOTED, CONTACT SERVICE ENGINEERING. IF NO DEFECTS ARE NOTED RE APPLY SPEED TAPE A) REPETITIVE ACTION REQUIRED COMPLIED WITH, NO ADDITIONAL DAMAGE OR DETERIORATION NOTED. OK TO CONTINUE SERVICE IN ACCORDANCE WITH REFERENCE EA-07683