What was found
R/H STAB HAS A CRACKED #3 STIFFENER AT THE #4 RIB LOWER END; STAB STA.120.3.(VERIFIED BY HFEC PART6; 51-00-00 PROC.23) / REPAIRED RIB PER SRM 55-10-09-2R-4. SEE SUB TASKS AND WIPS FOR DETAILS OF WORK ACCOMPLISHED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R/H STAB HAS A CRACKED #3 STIFFENER AT THE #4 RIB LOWER END; STAB STA.120.3.(VERIFIED BY HFEC PART6; 51-00-00 PROC.23) / REPAIRED RIB PER SRM 55-10-09-2R-4. SEE SUB TASKS AND WIPS FOR DETAILS OF WORK ACCOMPLISHED.