What was found
SUPPLEMENTAL INFORMATION: RIGHT HAND MAIN LANDING GEAR FORWARD BULKHEAD AT B.S. 540 VAPOR BARRIER CRACKED IN TWO (2) LOCATIONS.PERFORMED INTERIM REPAIR PER REPAIR 57 EA-07683 FOR FURTHER CORRECTIVE ACTION REF 943 & #V005123REPETITVE ACTION REQUIRED:REMOVE ALUM FOIL TAPE AND PERFORM DETAILED VISUAL INSP OF THE CRACK FOR ANY ADDITIONAL DAMAGE OR GROWTH. IF ADDITIONAL DEFECTS ARE NOTED; CONTACT SERVICE ENGINEERING. IF NO DEFECTS ARE NOTED RE APPLY SPEED TAPE / A) REPETITIVE ACTION REQUIRED COMPLIED WITH; NO ADDITIONAL DAMAGE OR DETERIORATION NOTED. OK TO CONTINUE SERVICE IN ACCORDANCE WITH REFERENCE REPAIR 57EA-07683