What was found
FWD CARGO AT FRAME STA 500D GUSSET AT STRINGERS 21R CRACK. 8-15 ; CORRECTED STR #. FWD CARGO AT FRAME STA 500D GUSSET AT STRINGERS 19R CRACK. 8-15 / CERTIFYING VOIDED WORK CAPTURED IN REFERENCE TO STEP 5 AND 6 THAT WAS ENTERED IN ERROR REGARDING HEAT TREATMENT.;CERTIFYING STEP 5 FOR COMPLETION OF HEAT TREATMENT.;CORRECTING LOCATION ON STEP NO1. REMOVED DAMAGED GUSSET AT FWD CARGO R/H SIDE STA 500D S-19R REF B737-700 SRM 51-40-02-0G-0.;FABRICATED GUSSET MAT USED 7075-0 .040 CLAD PO#1653447 PER REF DWG#143A9483.;HEAT TREATED GUSSET TO 7075-T62 AT AAR PO#1653447;HEAT TREATED NEW GUSSET P/N #143A9483-10 FROM 7075-O TO 7075-T62 IN REFERENCE BAC5602 AND AAR FORM OP 84; REV: 7.;INSTALLED NEW GUSSET AT FWD CARGO COMP AT FRAME STA 500D AT STRINGER 19R IN IAW 51-40-02-0G-0 AND DWG # 143A7902;LOCATED AND DRILLED NEW GUSSET AT FRAME STA 500D AT STRINGER 19R IN IAW 51-40-05-0G-0;OK TO INSTALL GUSSET;REMOVED AND INSTALLED NEW GUSSET AT FWD CARGO COMP AT FRAME STA 500D AT STRINGER 19RIN IAW 51-40-02-0G-0 AND DWG# 143A7902;REMOVED DAMAGED GUSSET AT FWD CARGO R/H SIDE STA 500D S-21R REF B737-700 SRM 51-40-02-0G-0.;TREATED WITH ALODINE AND PRIME NEW PART IN IAW SRM 51-20-01-0G-0;VERIFIED;VERIFIED STEP 11.;VERIFIED OP 84 HEAT TREAT FORM.;VERIFIED DAMAGE GUSSET STEP #1.;VERIFIED STEP #3 FABRICATION.;WORK CAPTURE IN REFERENCE TO STEP 5 ENTERED IN ERROR REGARDING HEAT TREATMENT.;VERIFIED HOLES OK; OK TO ALODINE AND PRIME NEW PART