What was found
CORROSION ON FRAME SPLICE AT AFT CARGO BAY BS787 RBL24 WL158. ; / [01] EVALUATED CORROSION ON FRAME SPLICE AT BS787 RBL24 WL158 FOUND TO BE OUT OF LIMITS DUE TO NO LIMITS IN SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0; [02] VERIFIED OUT OF LIMITS; [03] REMOVED ACB FRAME SPLICE BS 787 PER SRM 51-40-02-0G-0; [04] LOCATED; DRILLED AND DEBURRED NEW SPLICE @BS787 RBL24 WL158; PO#827222 IAW SRM 51-40-05 AND DWG #146A1262.; [05] VERIFIED LOCATE; DRILL AND DEBURR OF NEW SPLICE; BS787; RBL24; WL158; IAW SRM 51-40-05 AND DWG #146A1262; [06] OK TO INSTALL NEW FRAME SPLICE BS787 RBL24 WL158; [07] OK TO INSTALL NEW FRAME SPLICE IN ACB BS 787 RBL 24 WL 158.; [08] INSTALLED ACB FRAME SPLICE BS787 RBL24 WL158; IAW SRM 51-40-02-0G-0; DWG 146A1262.; [09] VERIFIED INSTALLATION OF ACB FRAME SPLICE BS787 RBL24 WL158; IAW SRM 51-40-02-0G-0; DWG 146A1262.; [10] VERIFIED COMPLETION OF CUSTOMER CARD TTG8Q005DWRA