What was found
CORROSION ON FLOOR TO SIDEWALL SUPPORT AT FWD CARGO BAY BS500 - BS500C LBL24 WL156. ; / [01] EVALUATED CORROSION; FOUND 0.015 REMOVED FROM ORIGINAL 0.040 IN 1'X60' AREA FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2472 S/N UNKNOWN; [02] VERIFIED EVALUATED CORROSION; FOUND 0.015 REMOVED FROM ORIGINAL 0.040 IN 1'X60' AREA FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2 USING DIAL DEPTH GAUGE ATS 2472 S/N UNKNOWN; [03] REMOVED FLOOR TO SIDEWALL SUPPORT BS 396-500D RBL 24; WL 156 PER SRM 51-40-02-0G-0.; [04] SHOULD READ LBL 24; NOT RBL.; [05] FABRICATED NEW L/H FLOOR TO SIDEWALL SUPPORT BS 396 TO 500D AND SPLICE DOUBLER FROM EXTRUSION BAC1496-444#7075 T62 CLAD LOT# 1466234-1 PER SRM 51-40-05-0G-0; SRM 53-00-53-2R-5; DWG 143A7501; DWG 143A7500; [06] VERIFIED STEP 5; [07] VERIFIED CORRECTIVE ACTION STEP 5<BR>OK TO APPLY CHEMICAL CONVERSION AND PRIMER; [11] INSTALLED SPLICE DOUBLER PER SRM 53-00-53-2R-5 AND DWG 143A7501; [12] CERTIFIED STEP 11; [13] RII INSPECTED GOOD INSTALLATION OF SPLICE DOUBLER PER SRM 53-00-53-2R-5 AND DWG 143A7501.; [14] SRM SPLICE REPAIR LOCATION IS AT BS 480+8'; [15] VERIFIED LOCATION OF SRM SPLICE REPAIR; [16] VERIFIED CORRECTIVE ACTION ITEMS 14 AND 15; [17] OK TO INSTALL L/H FLOOR TO SIDEWALL SUPPORT; [18] OK TO INSTALL; [19] INSTALLED FCB NEW FLOOR TO SIDEWALL SUPPORT AT BS396 - BS500D; LBL24; WL156 PER SRM 51-40-020G-0 AND DWG 143A7500