What was found
MAIN CABIN FWD WET AREA FLOOR STRUCTURE INTERCOSTAL CRACKED BETWEEN BS 328 AND BS 312 RBL-30. MKD 126/1. ; / [01] REMOVED FLOOR STRUCTURE INTERCOSTAL AT MAIN CABIN FWD WET AREA BETWEEN STA 312 - STA 328 RBL-30. REF: 51-40-02-0G-0.; [02] LOCATED AND DRILLED NEW INTERCOSTAL AS PER SRM 51-40-05-0G-0.; [03] VERIFIED STEP 2; [04] OK TO INSTALL NEW INTERCOSTAL; [05] INSTALLED NEW INTERCOSTAL AS PER SRM 51-40-02-0G-0 AND DWG 141A5400.; [06] VERIFIED INSTALLED NEW INTERCOSTAL AS PER SRM 51-40-02-0G-0 AND DWG 141A5400. RII; [07] REMOVED AND INSTALLED NEW INTERCOSTAL AT MAIN CABIN FORWARD WET AREA FLOOR STRUCTURE BETWEEN STATIONS 312 AND 328 RBL 30 AS PER SRM 51-40-02-0G-0 AND DWG 141A5400.; [08] VERIFIED STEP 7