What was found
CORROSION ON FORWARD CARGO BAY AFT BULKHEAD CENTER PANEL LOWER SUPPORT AT B.S. 500D; L.B.L. 24 - R.B.L. 24; W.L. 154. ; / [01] REMOVED FCB AFT BULKHEAD CENTER PNL LOWER SUPPORT AT BS 500D LBL24 RBL 24 WL 154. IAW. SRM 51-40-02; [02] REMOVED FCB AFT BULKHEAD CENTER PNL LOWER SUPPORT AT BS 500D LBL24 RBL 24 WL 154. IAW. SRM 51-40-02; [03] PART HAS NO ALLOWABLE DAMAGE LIMITS ON SRM REPAIR BY REPLACEMENT SRM 51-10-02.; [04] LOCATED AND DRILLED NEW BULKHEAD CENTER SUPPORT AND APPLIED CHEMICAL CONVERTION COATING AND PRIMERED ON HOLES AT BS 500D LBL 24 RBL 24 WL 154 IAW SRM 51-40-05 AND SRM 51-20-01 AND DWG: 143A7902 ID: 0053 AND REV: B; [05] LOCATED AND DRILLED NEW BULKHEAD CENTER SUPPORT AND APPLIED CHEMICAL CONVERTION COATING AND PRIMERED ON HOLES AT BS 500D LBL 24 RBL 24 WL 154 IAW SRM 51-40-05 AND SRM 51-20-01 AND DWG: 143A7902 ID: 0053 AND REV: B; [06] VERIFIED CORRECTIVE ACTION STEP 4.; [07] OK TO INSTALL; [08] OKAY TO INSTALL FCB AFT BULKHEAD CENTER PNL LOWER SUPPORT AT BS 500D LBL24 RBL 24 WL 154.; [09] INSTALLED FCB AFT BULKHEAD CENTER PNL LOWER SUPPORT AT BS 500D LBL24 RBL 24 WL 154. NIAW SRM 51-40-02 AND DWG 143A7902 REV:; [10] UPDATED MEASUREMENTS; [11] VERIFIED ALL ITEMS COMPLETE