What was found
CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT WL 153; RBL 23; STATIONS: 727D+4; 727D+6; 727D+14; 727D+16; 727D+18; 727E+2; 727E+6; 727E+10; 727E+14; AND AT WL 153; RBL 22; STATION 727E+2. ; / [01] REMOVED CORROSION ON FLOOR SIDEWALL SUPPORT AT WL153; STA 727D+4; 727D+6; 727D+14; 727D+16;727D+18;727E+2;727E+6;727E+10;727E+14; RBL 23 AND STA 727E+2; RBL 22. STATION 727E+10';RBL23; MEASURES: L= 1.300'; W=0.600'; D=0.011'.ORIGINAL THICKNESS= 0.040'; MATERIAL REMOVED=0.011'; REMAINING MATERIAL THICKNESS=0.029'. THE SIDEWALL SUPPORT IS OUT OF LIMITS.IAW. SRM 51-10-02; SRM53-00-53-1A-2 ALLOWABLE DAMAGE 2; STEP 4.A(2) (A). TOOL USED:MICROMETER. ID:ATS1671; DUE DATE:01/2022.; [02] VERIFIED CORROSION REMOVAL OUT OF LIMITS PER SRM 53-00-53-1A-2; [03] THIS DISCREPANCY WILL ACCOMPLISHED ON CARD TTG8Q0092WDW.; [04] VERIFIED WORK TO BE ACCOMPLISHED ON FAULT TTG8Q0092WDW