Service difficulty report · Stub Frame · Boeing 737

Difficulty date
November 4, 2021
Submitted
April 27, 2022
Operation
Air carrier
Aircraft
N451WN
Make and model
Boeing 737
Aircraft serial
32495
Aircraft time
58,865 hours, 34,665 cycles
Part
Stub Frame
Condition
Cracked
Location
Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SUPPLEMENTAL INFORMATION: CRACK SERVICE DOOR CUT OUT STUB FRAME LOCATED BS 294.5 AND BETWEEN STR 5R TO STR 10R AT FWD GALLEY AREA ; 2021-511903 / [01] TOOL USED CALIPER P/N 500-196-30 S/N A226522 DUE DATE 11-AUG-22; [02] RADIUS GAUGE P/N S167C S/N AE-28529 DUE DATE 20-JUL-22; [03] TOOL USED: TEMPERATURE CONTROLLER P/N P3015GOES00000 S/N 142811020 DUE DATE: 21-JAN-22. TEMPERATURE CONTROLLER P/N P3015GOES00000 S/N 1428011019 DUE DATE: 21-JAN-22; [04] REPLACED STUB FRAME LOCATED BS 294.5 AND BETWEEN STR 5R TO STR 10R AT FWD GALLEY AREA IAW B737-700 SRM 51-10-02; Ï¿½TEM 9; SRM 51-40-02 AND DWG 141A8370 SEE INDIVIDUAL SIGNOFF BELOW.; [05] TASK CARD COMPLETED <BR>RII<BR>SEE INDIVIDUAL SIGNOFF BELOW.