Service difficulty report · Angle · Boeing 7377H4

Difficulty date
October 26, 2021
Submitted
December 20, 2021
Operation
Air carrier
Aircraft
N778SW
Make and model
Boeing 7377H4
Aircraft serial
27883
Aircraft time
68,867 hours, 40,745 cycles
Part
Angle
Condition
Corroded
Location
Rh Wing
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

RT WING I/B FRONT SPAR BOOST PUMP 2 FWD UPPER BONDING STRAP SURROUNDING STRUCTURE CORRODED. REMOVED BONDING STRAP IAW SRM 51-40-02-0G-0. INSTALLED EWIS PROTECTION IAW AMM 20-60-07-913-801. DISCONNECT CONNECTOR (D00076) AND CAPPED IAW AMM 28-22-41-000-801. REMOVED ANGLE AT RT WING ABOVE BOOST PUMP IAW SRM 51-40-02-0G-0, INSTALLED RT WING I/B FROM SPAR BOOST PUMP FWD UPPER ANGLE IAW SRM 57-20-10-1A-3 STEP 2.C. INSTALLED BONDING STRAP IAW AMM 20-50-11-910-80.

More about the Boeing 737-7H4