What was found
RT FWD CARGO FLOOR BS 500A - 500D, S25R, WL 155.5 Z CHANNEL HAS CORROSION IN SEVERAL AREAS. LOCATED AND DRILLED A NEW Z CHANNEL IAW SRM 51-40-05-0G-0. VERIFIED STEP 1. TREATED AND APPLIED PRIMER TO Z CHANNEL IAW SRM 51-20-01-0G-0. FOUND OUT OF LIMITS IAW SRM 53-00-53-1A-2. LOCATED AND DRILLED THE NEW Z CHANNEL IAW SRM 51-40-05-0G-0.