What was found
LEFT HAND HORIZONTAL STABILIZER INSPAR RIB; STATION 120.30.; 4TH VERTICAL STIFFENER IS CRACKED. ; / CUT AND REMOVED THE DAMAGE FROM THE 4TH VERTICAL STIFFENER OF THE L/H HORIZONTAL STABILIZER RIB STA 120.30 IAW SRM 55-10-09-2R-4 ; REPAIR 4FABRICATED -3FILLER FROM 7075T6 0.050' LOT#5087747-1 CLAD . AND FABRICATED (2EA) -4 SHIMS FROM 7075T6#0.020' LOT# 1472548-1 ; LOCATE; DRILLED AND APPLIED A CHEMICAL CONVERSION COATING TO ALL REPAIR PARTS IAW SRM 55-10-09-2R-5 REPAIR 5 ; OK TO PRIME; [11] VERIFIED CORRECTIVE ACTION 10; [12] PERFORMED A GENERAL VISUAL INSPECTION OF ALL AREAS WITHIN THE REPAIR AREA (INCLUDING UNDERLYING STRUCTURE ) FOR CORROSION ; EXISTING REPAIRS OR ANY OTHER DEFECTS ; IAW SRM 55-10-09-2R-5 REPAIR 5; [13] VERIFIED CORRECTIVE ACTION 12. NO CORROSION; EXISTING REPAIRS; OR DEFECTS NOTED; [14] APPLIED A CHEMICAL CONVERSION COATING AND PRIMER TO ALL REWORKED AREAS AND ALL REPAIR PARTS IAW SRM 55-10-09-2R-5 REPAIR 5 ; OK TO INSTALL; [15] VERIFIED CORRECTIVE ACTION ENTRY 14.<BR><BR>OK TO INSTALL REPAIR PARTS; [16] INSTALLED REPAIR PARTS AND APPLIED FILLET SEAL TO REPAIR PARTS IAW SRM 55-10-09-2R-5 STEP 4.N - R.; [17] VERIFIED CORRECTIVE ACTION ENTRY 16.; [18] REPAIRED CRACK DAMAGE LEFT HAND HORIZONTAL STABILIZER INSPAR RIB STA120.30; 4TH VERTICAL STIFFENER IAW SRM 55-10-09-2R-5.; [19] VERIFIED CORRECTIVE ACTION ENTRY 18.