What was found
CORROSION FLOOR STRUCTURE BEAM UPPER CHORD BS 986;5 RBL 38 AND RBL 43 WL 208.1 AT AFT GALLEY AREA ; 2022-11319 / [01] UT TOOL USED: PN : 45MG; SN: 130061901. DUE DATE: 11-MAY-22<BR>ET TOOL USED: PN: NORTEC 600D; SN: 210138503. DUE DATE: 05-MAR-22; [02] TOOL USED EDDY CURRENT INSTRUMENT P/N NORTEC500D S/N N500X12101V022235 DUE DATE 03-JUN-22; [03] REPAIRED FLOOR STRUCTURE BEAM UPPER CHORD BS986.5 RBL 38 AND RBL 43 AND AT AFT GALLEY AREA IAW EA: 22-153-00188 WIP 1 REV 2 AND EA SUMMARY 22-153-00188. SEE INDIVIDUAL SINGOFFS BELOW.; [04] REPAIRED FLOOR STRUCTURE BEAM UPPER CHORD BS986.5 RBL 38 AND RBL 43 WL 208.1 AND AT AFT GALLEY AREA IAW EA: 22-153-00188 WIP 1 REV 2 AND EA 22-153-00188. SEE INDIVIDUAL SINGOFFS BELOW.<BR>RII