What was found
AFT CARGO BAY; CORROSION ON SUPPORT ANGLE LWR SURFACE; BS 850; RBL 20; WL 160 / [01] EVALUATED CORROSION ON ANGLE BS 847+3 RBL 20 WL 160; FOUND TO BE OUT OF LIMITS PER SRM DUE TO NO LIMITS IN THE SRM AND REQUIRES REPLACEMENT PER SRM 51-10-02-0G-0;[02] VERIFIED CORRECTIVE ACTION #1;[03] REMOVED SUPPORT ANGLE PER SRM 51-40-02-0G-0;[04] RECEIVED FORMED ANGLE; FROM OSS OUT FOR HEAT TREAT. PO# 854508-SWA.;[05] LOCATED AND DRILLED FORMED SUPPORT ANGLE; BS850; RBL20; WL160; AND APPLIED CHEMICAL CONVERSION COATING; ALL IAW SRM 51-40-05-0G-0; SRM 51-20-01-0G-0; DWG 146A8123-14. AND OK TO PRIME.;[06] VERIFIED CORRECTIVE ACTIONS 4; 5. <BR><BR>OK TO PRIME PART.;[07] REQUESTING OK TO INSTALL NEW ANGLE; BS 850; RBL 20.;[08] VERIFIED CORRECTIVE ACTION 7. OK TO INSTALL;[09] INSTALLED NEW SUPPORT ANGLE BS850 RBL 20; WL 160; IAW SRM 51-40-02-0G-0; DWG 146A8123-14;[10] VERIFIED CORRECTIVE ACTION 1.;[11] ALL WORK ACCOMPLISHED. PART REPLACED.