What was found
CORROSION ON AFT BULKHEAD TO FLOOR SUPPORT ANGLE AT AFT CARGO BAY BS947 LBL9 TO RBL13. / [01] REMOVED CORROSION ON AFT BULKHEAD TO FLOOR SUPPORT ANGLE AT AFT CARGO BAY BS 947 LBL9 TO RBL13 IAW SRM 51-10-HOLE NOT DRILLED AND SEVERAL HOLES NOT COUNTERSUNK. SEE STEP 1.;[09] ENTRY STEP 1. COMPLETED.;[10] COMPLETED STEP 1 REJECTION;[11] REQUEST OK TO INSTALL.;[12] VERIFIED CORRECTIVE ACTION # 11; OK TO INSTALL;[13] INSTALLED NEW BULKHEAD ANGLE AT ACB BS 947.5; LBL 9 TO RBL 13; IAW SRM 51-40-02-0G-0 AND DWG 149A8110;ID:0013; REV:B;[14] ADDED INSTALATION DWG: 149A8117 ID: 0002 REV: -;[15] VERIFIED CORRECTIVE ACTIONS 13; 14. INSTALLATION COMPLETED;[16] TASK CARD COMPLETE;[17] UPDATED MEASUREMENT CHART;[18] VERIFIED MEASUREMENT CHART UPDATED AND FAULT IS COMPLETE.