What was found
CRACK FOUND A/C BAY UPPER ATTACH ANGLE AT BS 663 LBL 8. CUT OUT DAMAGE IAW SRM 57-10-10-2R-5 FIG 202. FABRICATED REPAIR IAW SRM 57-10-10-2R-5. VERIFIED ITEMS 1 & 2. ACCOMPLISHED DVI OF REPAIR AREA & UNDERLYING STRUCTURE IAW SRM 57-10-10-2R-5 REPAIR 5 ITEM 4D. NO DEFECTS NOTED. HFEC IAW NDT 6; 51-00-00 PROC 16. NO DEFECTS NOTED. LOCATED, DRILLED & TRIMMED TO FINAL SIZE. TREATED & PRIMED REPAIR PARTS IAW SRM 57-10-10-2R-5 REPAIR 5. INSTALLED ALL REPAIR PARTS. FASTENERS INSTALLED IAW SRM 57-10-10-2R-5. SEALED INTERNAL & EXTERNAL FASTENERS IAW SRM 57-10-10-2R-5. INSPECTION CW STEP 13. APPLIED CIC PER SRM 57-10-10-2R-5 STEP 4.O. ACCOMPLISHED FUEL TANK LEAK CHECK IAW AMM 28-11-00. LEAK CHECK GOOD.