What was found
CORROSION ON TOILET SERVICE DOOR 145AL INNER SURFACE AROUND BONDING JUMPER. / [01] SRM 52-40-01-1A-4 IS FOUND TO BE APPLICABLE FOR REPAIR.<BR><BR>BLENDED CORROSION ON TOILET SERVICE DOOR 145AL INNER SURFACE AROUND BONDING JUMPER PER SRM 51-10-02-0G-0. REMOVED .003' MATERIAL INSIDE POCKET AREA WHICH IS .O60' THICK PER SRM 52-40-01-0I-4 (IDENTIFICATION) TABLE 2. UNABLE TO REMOVE CORROSION BECAUSE ALLOWABLE LIMITS IN SRM 52-40-01-1A-4 FIGURE 103 ARE ALREADY EXCEEDED AND BLENDING IS STILL REQUIRED. THEREFORE PART IS OUT OF LIMITS AND ONLY REPAIABLE BY REPLACEMENT PER SRM 51-10-02-0G-0 STEP 9. A. (2).<BR><BR>TOOL USED: <BR>ID:4678B<BR>SN:UNKNOWN<BR>DATE:12/2021<BR>DUE:12/2022;[02] REMOVED TOILET SERVICE DOOR PANEL 145AL TO PREPARE FOR REPLACEMENT PER AMM 52-49-07-000-801.;[03] VERIFIED CORRECTIVE ACTION ITEMS 1 AND 2.;[04] INSTALLED NEW TOILET SERVICE DOOR (145AL) USING EXISTING HARDWARE PER AMM 52-49-07-400-801. BONDING CHECK OF GROUNDING STRAP GOOD.<BR><BR>TOOL USED: BONDING METER<BR>ID:ATS1255<BR>S/N:DC003959<BR>DATE:10/2021<BR>DUE:10/2022;[05] VERIFIED CORRECTIVE ACTION 4.;[06] INSTALLED NEW PLACARD P/N:BAC27DPA5116 ON TOILET SERVICE DOOR 145AL IAW SOPM 20-50-05 STEPS 3.C.D.E.;[07] CORRECTED MEASUREMENTS;[08] VERIFIED ALL STEPS COMPLETED;[09] VERIFIED ITEMS 6;7;8 CORRECTIVE ACTIONS.