What was found
CORROSION>>>>> FWD E&E COMP INTERCOSTAL CORRODED AT BILGE AREA BS 360 LBL-10 / [01] REMOVED INTERCOSTAL WEB AT FWD E&E COMP STA 360 FOR ACCESS TO REWORK CORROSION PER REF B737-700 SRM 51-40-02-0G-0.;[02] EVALUATED DAMAGE WEB; FOUND EXFOLIATING CORROTION; CORROSION PASS THRU ; FOUND OUT OF LIMITS PER REF B737-700 SRM 53-00-04-1A-1.;[03] VERIFIED STEPS 1 AND 2.;[04] FABRICATED WEB ORIGINAL MATERIAL 7075 T6 0.032' AS PER BOEING DWG141A8512.;[05] LOCATED AND DRILLED WEB AS PER REF B737 SRM 51-40-05-0G-0.;[06] VERIFIED STEP 4 AND 5 . OK TO TREAT AND PRIMER.;[07] TREATED AND PRIMED FABRICATE WEB PER REF B737-700 AMM 51-21-41-370-802. AND AMM 51-21-72-370-804.;[08] VERIFIED TREAT AND PRIMER;[09] OK TO INSTALL WEB.;[10] INSTALLED FABRICATED INTERCOSTAL WEB AT FWD E&E COMP.STA 360 PER REF B737-00 SRM 41-40-02-0G-0 AND DWG 141A8512.;[11] REMOVED CORROED INTERCOSTAL WEB;EVALUATED DAMAGE; FOUND EXFOLIATING CORROTION OUT OF LIMITS; FABRICATED NEW INTERCOSTAL WEB AND INSTALLED AT FWD E&E COMP.STA 360 LBL 10 PER REF B737-700 SRM 51-40-02-0G-0.SRM 53-00-04-1A-1. DWG 141A8512.;[12] VERIFIED STEPS 10 AND 11.