What was found
FWD CARGO COMPARTMENT L/H TRANSITION ANGLE HAS CORROSION AT FASTENER HOLE STA. 500B + 16' LBL 25 / [01] BLENDED OUT CORROSION AT FWD CARGO L/H TRANSITION ANGLE STA 500B+16? PER SRM 51-10-02. MEASURED AND FOUND OUT OF LIMITS PER SRM 53-00-53-1A-2 FIG.103; DETAIL D.;[02] REMOVED A SECTION FROM STA. 500A+10 TO STA. 500F +9 FOR REPAIR PER SRM 53-00-53-2R-5 .;[03] LOCATED; DRILLED ;TREATED AND PRIMED THE REPAIR PARTS PER SRM 53-00-53;AND SRM 51-20-01.;[04] VERIFIED LOCATED; DRILLED ;TREATED AND PRIMED THE REPAIR PARTS FOR CORRECTIVE ACTION #3.;[05] OK TO INSTALL NEW FABRICATED L/H TRANSITION ANGLE SECTION FROM STA. 500A+10 TO STA. 500F +9;[06] REPAIRED PER EA-22-153-01673 AND SRM 53-00-53-2R-5.;[07] C/W INSPECTION OF TRANSITION ANGLE INSTALL;[08] C/W INSPECTION OF TRANSITION ANGLE INSTALL;[09] REPAIRED PER EA-22-153-01642 AND SRM 53-00-53-2R-5.;[10] LINE #6 SIGNED OFF WITH INCORRECT EA.;[11] NOTED CORRECTION OF EA REF. ON STEP #6. THE CORRECT REF. IS REPAIRED PER EA-22-153-01642 AND SRM 53-00-53-2R-5.;[12] REPAIRED FWD CARGO LH TRANSITION STA 500B + 16'; LBL 25 PER<BR>EA 22-153-01642 AND SRM 53-00-53-2R-5.;[13] ANGLE WAS REPAIRED FWD CARGO LH TRANSITION STA 500B + 16'; LBL 25 PER<BR>EA 22-153-01642 AND SRM 53-00-53-2R-5. SEE CORRECTIVE ACTIONS AND STEPS FOR ALL WORK PERFORMED.;[14] (RII)ANGLE WAS REPAIRED FWD CARGO LH TRANSITION STA 500B + 16'; LBL 25 PER<BR>EA 22-153-01642 AND SRM 53-00-53-2R-5. SEE CORRECTIVE ACTIONS AND STEPS FOR ALL WORK PERFORMED.