What was found
R/H HORIZONTAL STABILIZER MOVEABLE L/E FAIRING RIB 5 CRACKED @ EDGE MKD DOT C0RRECTION OF RIB 5 TO RIB 6 R/H HORIONTAL STAB FRONT SPAR FAIRING / [01] PERFORMED HFEC INSP ON R/H HORIZ STAB MOVEABLE L/E FAIRING RIB#5 IAW B737 NDT P6 51-00-00 PROC.23; CRACK NOTED (CRACK LENGTH 0.200')<BR>TOOL USED : NORTEC 600 B/C 172389 CALDUE: 03/23;[02] CORRECTION ON FAULT LOCATION: R/H HORZ. STAB. MOVEABLE L/E FAIRING RIB 6; L/E STA. 114.55; CRACKED @ EDGE MKD.;[03] REMOVED CRACKED RIB #6; L/E STA. 114.55; AT R/H HORZ. STAB. MOVEABLE L/E FAIRING; AS PER B737-7 SRM 51-40-02.;[04] NOTE : STEP 1 - CORRECT LOCATION IS RIB #6.<BR>PERFORMED HFEC HOLE PROBE INSPECTION ON ALL REMOVED FASTENER LOCATIONS IAW NDTM PART 6; 51-00-00; PROCEDURE 16. NO CRACKS. [NORTEC 600 ; B/C 166316 ; CALIB.DUE- 10/22];[05] PERFORMED HFEC COUNTERSINK INSPECTION ON ALL REMOVED FASTENER LOCATIONS IAW NDTM PART 6; 53-30-00; PROCEDURE 3. NO CRACKS. [NORTEC 600 ; B/C 166316 ; CALIB.DUE- 10/22];[06] VERIFIED AND INSPECTED STEP#2 AND #3;[07] OK TO INSTALL RIB #6.;[08] REPLACED RIB #6 AT R/H HORIZ. STAB L/E FAIRING PER B737-700 SRM 51-40-02-0G-0.;[09] VERIFIED STEP 8