What was found
APU COMPT CUTOUT; RH SIDE; ANGLE AT RBL 25 IS CORRODED AT NUTPLATE LOCATIONS (MARKED) / [01] UPDATED STEPS.<BR><BR>VERIFIED APPLICABILITY; NO FOUND ALLOWABLE DAMAGE ON SRM;[02] VERIFIED CORROSION REMOVAL PER SRM 51-10-02 STEP 15. SRM HAS NO ALLOWABLE LIMITS FOR AFFECTED STRUCTURE. MEASUREMENT TABLE VERIFIED.;[03] COMPLETED STEPS 1-6.;[04] CORRECTED ANGLES P/N.;[05] REMOVED 3EA ANGLES LOCATED AT APU COMPT CUTOUT; RH SIDE AND RBL 25 PER REF SRM 51-40-02-0G;[06] LOCATED AND DRILLED NEW 3EA ANGLES P/N: 148A8635-5;P/N: 148A8635-4;P/N: 148A8635-3; LOCATED AT APU COMPT CUTOUT; RH SIDE AND RBL 25 I.A.W SRM 51-40-05-0G-0 AND DWG 148A8540.AND OK TO INSTALL.;[07] VERIFIED CORRECTIVE ACTION 4; 5 AND 6 COMPLETED. OK TO INSTALL COMPLETED;[08] INSTALLED NEW 3EA ANGLES P/N: 148A8635-5;P/N: 148A8635-4;P/N: 148A8635-3; PER REF SRM 51-40-02-0G-0 AND DWG 148A8540;[09] VERIFIED CORRECTIVE ACTION 8 INSTALLATIONS;[10] TASK COMPLETE