What was found
AFT CARGO R/H TRANSITION ANGLE IS OUT OF LIMITS AT STA 727J +6 / [01] REMOVED DAMAGED TRANSITION ANGLE FROM STA. 727H+10 THRU STA. 767 R/H;[02] MATCH DRILLED; DEBURED; CSK; TREATED AND PRIMED ZEE ANGLE AND SPLICE PER SRM 53-00-53-2R-5;[03] VERIFIED... C/W MATCH DRILLED; DEBURED; CSK; TREATED AND PRIMED ZEE ANGLE AND SPLICE PER SRM 53-00-53-2R-5;[04] INSTALLED NUT PLATES PER SRM 51-40-10<BR><BR> DATE JULY 15; 2022<BR>TIME 5:00 A.M;[05] PERFORMED PUSH TEST ON ADHESIVELY BONDED NUTPLATES PER SRM 51-40-10-2R-0.;[06] CORRECTIVE ACTION 5. JOHN PRAMUK (TECHNICIAN); 15-JUL-2022 12:19 UTC PERFORMED PUSH TEST ON ADHESIVELY BONDED NUTPLATES PER SRM 51-40-10-2R-00. ENTERED IN ERROR.;[07] INSTALLED AFT CARGO RT ZEE SIDEPLATE CHANNEL AND REPAIR PARTS FROM STA. 727H+10 TO STA. 767 PER SRM 53-00-53-2R-5.;[08] INSTALLATION 727H+10 TO 767 OK. NUTPLATES MUST BE PUSH TESTED NO EARLIER THAN 2200 UTC;[09] PERFORMED PUSH TEST ON ADHESIVELY BONDED NUT PLATES IN COMMON WITH REPAIR PER SRM 51-40-10-2R-0.