Service difficulty report · Angle · Boeing 7378H4

Difficulty date
July 30, 2022
Submitted
August 15, 2022
Operation
Air carrier
Aircraft
N8501V
Make and model
Boeing 7378H4
Aircraft serial
41530
Aircraft time
19,786 hours, 9,377 cycles
Part
Angle
Condition
Corroded
Location
Fwd Cargo
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FWD CARGO FLOOR L/H TRANSITION ANGLE STA. 500C (+12) HAS CORROSION AROUND FASTENER HOLE. / [01] REMOVED DAMAGE PER SRM 51-10-02. FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2.;[02] 1. ABUYE KEBEDE (TECHNICIAN); 01-AUG-2022 08:17 UTC<BR>REMOVED DAMAGE PER SRM 51-10-02. FOUND TO BE OUT OF LIMITS PER SRM 53-00-53-1A-2. VERIFIED.;[03] CUT AND REMOVED DAMAGED L/H TRANSITION ANGLE PER SRM 53-00-53-2R-5.;[04] 3. ABUYE KEBEDE (TECHNICIAN); 02-AUG-2022 09:24 UTC<BR>CUT AND REMOVED DAMAGED L/H TRANSITION ANGLE PER SRM 53-00-53-2R-5.<BR>C/W RII INSPECTION.;[05] OK TO INSTALL;[06] INSTALLED REPAIR PER SRM 53-00-53-2R-5;[07] INSTALLED BONDED NUT PLATES PER SRM 51-40-10-2R-0;[08] INSPECTED INSTALLED REPAIR;[09] WORK PERFORMED CERTIFICATION INDEPENDENT INSPECTION<BR>1. HERNANDEZ; ANDY (COMPLETE)<BR>10-AUG-2022 08:05:49<BR>ACCOMPISHED PUSH TEST ON BONDED NUT PLATES FWD CARGO L/H TRANSITION ANGLE REPAIR ( YELLOW 70 IN LBS.) IAW SRM 51-40-10-2R01.<BR>C/W INSPECTION.;[10] VERIFIED ALL STEPS COMPLETED AND SIGNED OFF.;[11] 10. ERIC GRASKEY (TECHNICIAN); 10-AUG-2022 08:13 UTC<BR>VERIFIED ALL STEPS COMPLETED AND SIGNED OFF.<BR>C/W INSPECTION.

More about the Boeing 737-8H4