What was found
CABIN FLOOR PANEL 232CF UPPER SKIN HAS PULLED STRANDS AT THE AFT O/B CORNER. (MARKED) / [01] IDENTIFIED PANEL 232CF IAW SRM 53-00-50-0I-1 TABLE 3 FIG 3.<BR><BR>DAMAGE NOTED IS OUT OF ALLOWABLE DAMAGE LIMITS IAW SRM 53-00-50-1A-1 PARA 4B<BR><BR>TO BE REPAIRED IAW SRM 53-00-50-2R-1<BR> <BR>REMOVED 3 THROUGH INSERTS TO FACILITATE REPAIR IAW SRM 53-00-50-2R-1 PARA 3B<BR><BR>REMOVED DAMAGE TO UPPER SURFACE PLIES AND CLEANED REPAIR AREA IAW SRM 53-00-50-2R-1 PARA 3C-F;[02] VALIDATED APPLICABILITY OF SRM 53-00-50-2R-1.;[03] FABRICATED REPAIR PLIES FROM BMS9-3H2 LOT#1493221-1; OK TO INSTLL IAW SRM 53-00-50-2R-1 PARA 3K;[04] VERIFIED CORRECTIO ACTION ITEMS 1 - 3.<BR>OK TO INSTALL.;[05] INSTALLED REPAIR PLIES USING BMS8-201 LOT#1482288-1; VACUUM BAGGED; CHECKED FOR LEAKS; LEAK CHECKED GOOD USING VACUUM GAUGE ATS2438 CAL DUE DATE 03/2023 AND SET FOR CURE IAW SRM 53-00-50-2R-1 PARA 3K-M;[06] VERIFIED CORRECTIVE ACTION ITEM 5.;[07] CURED; UNBAGGED AND LIGHTLY SANDED REPAIR IAW SRM 53-00-50-2R-1 PARA 3M<BR><BR>INSTALLED 3 THROUGH INSERTS USING BMS5-107 LOT#AK1KP9159K AND CURED USING HEAT LAMP IAW SRM 53-00-50-2R-1 PARA 3N<BR><BR>USED THERMOMETER ATS2208 CAL DUE DATE 10/2022;[08] VERIFIED CORRECTIVE ACTION ITEM 7. REPAIR COMPLETE.;[09] VERIFIED REPAIR COMPLETE.