What was found
CORROSION ON AFT CARGO BAY FLOOR TO SIDEWALL SUPPORT AT RBL 21 BS 727I+1; BS 727I+3; BS 727I+6-727I+11; BS 727I+12-727J+4; 727J+5-727J+16; BS 727J+18; BS 747-747+12; BS 747+14-747+19. / [01] ENTERED MEASUREMENTS;[06] FABRICATED AND LOCATED AND DRILLED NEW SIDEWALL SUPPORT AT ACB BTW BS 727 TO BS 767 RBL 21 AND SPLICE REPAIR BTW BS 727F TO BS 727G RBL 21 <BR>USED MATERIAL: BAC1496-377#7075T62 LOT: 1494598-1.<BR>APPLIED CHEMICAL CONVERSION COATING AT REPAIR PARTS IAW SRM 53-00-53-2R-5 FIG 202. REQUEST OK TO PRIMER AT REPAIR PARTS.;[07] VERIFIED CORRECTIVE ACTION 6 COMPLETED AND OK TO PRIMER REPAIR PARTS GIVEN;[08] APLLIED PRIMER AT REPAIR PARTS IAW SRM 53-00-53-2R-5 REPAIR 5 AND SOPM 20-41-02.;[09] VERIFIED CORRECTIVE ACTION #8;[10] INSTALLED ACB SIDEWALL SUPPORT REPAIR PARTS IAW SRM 51-40-02-0G; SRM 53-00-53-2R-6 REPAIR 6 AND DWG 146A7502;[11] OK TO INSTALL FLOOR TO SIDEWALL SUPPORT AT ACB; RBL 21; BS 727 TO BS 767;[12] VERIFIED CORRECTIVE ACTION 10 AND 11 COMPLETE OK TO INSTALL GIVEN;[13] COMPLETED INSTALLATION OF SIDEWALL SUPPORT IAW SRM 51-40-02-0G-0 AND DWG 146A7500 SH 233; REV :-; DWG 146A7502 SH 50; REV:-;[14] VERIFIED CORRECTIVE ACTION #13<BR>VERIFIED MEASUREMENT TABLE