Service difficulty report · None · Boeing 737

Difficulty date
August 19, 2022
Submitted
September 22, 2022
Operation
Air carrier
Aircraft
N489WN
Make and model
Boeing 737
Aircraft serial
33855
Aircraft time
57,460 hours, 34,246 cycles
Part
None
Part number
141A550426
Condition
Corroded
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

STA 328 FLOOR BEAM UPPER FLANGE HAS CORROSION COMMON TO FASTENER HOLES AT BL 0; RBL 37.5; RBL 47.5; AND RBL 54.5; WL 208. / REMOVED CORROSION ON FLOOR TO BEAM UPPER CHORD BS 328 RBL 54.5 WL 208 IN L=1.500' X W=2' X D=0.035' FROM ORIGINAL TICKNESS OF .125' FOUND TO BE OUT OF LIMITS. FABRICATED (-1) 'T'-CHORD FROM BAC 1505-100224 7075-T6511 LOT.5070057-1; 2EA (-2) ANGLES REPAIR FROM BAC 1490-2811 7075-T6 LOT. 1491932-1 AND 2EA (-3) ANGLES REPAIR FROM BAC 1490-2900 7075-T6 LOT. 1495938-1 ; LOCATED AND DRILLED REPAIR PARTS IAW SRM 53-10-51-2R-7 AND SRM 51-40-05-0G-0; TRIMMED THE FLANGE FROM THE TOP TWO FASTENERS OF THE MACHINED INTERCOSTAL ATTACHED TO THE FLOOR BEAM AT BS328 RBL 24.82 IAW SRM 53-10-51-2R-7 PAR.4.F(1-3B) FIG 204 SHEET 9; FABRICATED REPAIR PARTS ITEM 4 SHIM (9EA) USING SAME T-CHORD VERTICAL FLANGE BAC1505-100224 7075-T6511 LOT#5070057-1;ITEM 5 ANGLE USING EQUIVALENT 0.080' FORMED ANGLE BAC1490-2900 7075-T6 LOT#1495938-1 AND ITEM 6 FILLER (3EA) FROM 7075-T6 0.020 LOT# 1472548-1 LOCATED;DRILLED APPLIED CHEMICA CONVERSION COAT AND PRIMED ALL I.A.W SRM 53-10-51-2R-7 PAR.4.H-N;[19] VERIFIED CORRECTIVE ACTIONS 17 AND 18.; INSTALLED T-CHORD AND SPLICE ANGLES ON BS 328 FLOOR BEAM FROM LBL 9 TO RBL 62 IAW SRM 53-10-51-2R-7; .INSTALLED PARTS LISTED ON CORRECTIVE ACTION 18 I.A.W SRM 53-10-51-2R-7 REPAIR 7 PAR 4.O;UPDATED INSTALLATION OF STEPS 3;5;8-13COMPLETED BS328 REPAIR LBL7-RBL65 I.A.W SRM 53-10-51-2R-7 REPAIR 7 ALT 2