What was found
INDICATION OF CRACK AT VAPOR BARRIER PRESSURE WEB UPPER ATTACH ANGLE AT LBL 43 BS 663 WL 164. FWD SIDE / [01] REQUEST NDI FOR HFEC INSPECTION FOR CRACK FREE CONDITION;;[10] FABRICATED UPPER ANGLE IAW SRM 57-10-10-2R-5 FROM 2024 T3 0.063 LOT.# 1479101-1; LOCATED AND DRILLED NEW ANGLE IAW SRM 51-40-05-0G-0. REQ. OK TO TREAT AND PRIME;[14] LOCATED AND DRILLED NEW ANGLE IAW SRM 51-40-05-0G-0 AND DWG 111A1000 REV.- AND 111A1001 REV.-B. REQ. OK TO TREAT AND PRIME;[36] VERIFIED INSTALLATION OF THE BS663 UPPER L ANGLE FROM LBL3- LBL60 PER SRM 51-40-02-0G-0 AND DWG 111A1000 REV.-. OK TO CAP SEAL FASTENERS COMMON TO THE BS663 WEB AND IN TANK FASTENERS.;[37] APPLIED CAP SEAL AT FASTENERS AFT SIDE L/H VAPOR VARRIER AND HEAD FASTENERS COMMON TO FUEL TANK IAW AMM 51-31-00-390-805 AND APPLIED EDGE SEAL AT UPPER ATTACH ANGLE IAW AMM 51-31-00-39-804;[38] VERIFIED CORRECTIVE ACTION 37. DAVCOR WILL SEAL THE IN-TANK FASTENERS ON THEIR WORK ORDER.;[39] IN TANK WORK COMPLETE.<BR>REF ATTACHED DAVCOR AVIATION SERVICES W/O 2211M826.<BR>FAULT TTG8Q00E71HR COMPLETED.;[40] ADDED MEASUREMENTS;[41] VERIFIED CARD COMPLETE AND MEASUREMENT TABLE;[42] VERIFIED CARD COMPLETE AND MEASUREMENT TABLE