What was found
CORROSION; AFT LH MOP SILL; BS 947 TO BS 995 / [01] UPDATED MEASUREMENTS CHART;[02] REMOVED CORROSION ON AFT LH MOP SILL BETWEEN BS 947 TO 995. L=10' X W=3' X D=0.012' FOUND TO BE OUT OF LIMITS WITH A REMAINING THICKNESS OF 0.068' OF ORIGINAL THICKNESS OF 0.080'<BR>CORROSION REMOVED IAW SRM 53-70-15-0I-1 AND SRM 53-70-15-1A-1.<BR>TOOL USED:<BR>DIAL DEPTH GAUGE ID: ATS2677; SN: UKNOWN; DATE DUE: 11/2022;[07] LOCATED AND DRILLED NEW AFT LH MOP SILL P/N 147A 8540-7 I.A.W SRM 51-40-05-0G-0; DWG.147A8501 AND DWG.147A0004. O.K. TO INSTALL;[08] INSPECTED & VERIFIED CORRECTIVE ACTION ITEM 7; ***EXCEPT OK TO INSTALL.***;[09] VERIFIED CORRECTIVE ACTION 6.<BR>PARTIAL UPDATE STEP 1.<BR>OK TO INSTALL MOP SILL AND MOP SILL SUPPORT;[10] STARTED INSTALLING MOP SILL AND MOP SILL SUPPORT IAW SRM 51-40-02. ISTALLED CLECOS IN ALL REMAINING HOLES.;[11] INSTALLED AFT LH MOP SILL P/N 147A8540-7; I.A.W SRM 51-40-02-0G-0; DWG. 147A8501; DWG 147A0004; AND DWG 147A0060.;[12] INSTALLED TEMPORARY AND PERMANENT FASTENERS BEFORE SQUEEZE OUT TIME AT AFT LH MOP SILL P/N 147A 8540-7 APPLIED PS 870 C20 SEALANT AT 27-AUG-2022 16:25 UTC I.A.W SOPM 20-50-19 AND SRM 51-40-02-0G-0 AND DWG. 147A8501.;[13] APPLIED PS 870 C20 SEALANT AT 27-AUG-2022 22:30 UTC.<BR>CORRECTED TIME FOR ITEM 12 WHICH IS ATTACHED TO ITEM 10 OF CORRECTIVE ACTIONS.;[14] VERIFIED CORRECTIVE ACTIONS STEPS 11;13 AND MEASUREMENTS TABLE.;[15] TASK CARD COMPLETE;[16] UPDATED PARTS;[17] VERIFIED TASK COMPLETE.