Service difficulty report · Web · Boeing 7377H4

Difficulty date
August 18, 2022
Submitted
September 27, 2022
Operation
Air carrier
Aircraft
N489WN
Make and model
Boeing 7377H4
Aircraft serial
33855
Aircraft time
57,460 hours, 34,246 cycles
Part
Web
Condition
Corroded
Location
Aft Fuselage
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION; FLOOR AFT SHEAR WEB; BS 1016 TO BS 1016 + 15'; LBL 4 TO LBL 25; WL 208 / [01] REMOVED SURFACE CORROSION ON 1016 SHEAR WEB IN TWO AREAS IAW SRM 51-10-02-0G-0. <BR>AREA 1) 3'X16'<BR>AREA 2) 2' 2.5'<BR>SRM DOES NOT HAVE ALLOWABLE LIMITS FOR CORROSION REMOVAL ON SHEAR WEBS AT BS 1016 AREA.;[02] UPDATED MEASUREMENT TABLE;[03] UPDATED CORROSION LEVEL;[04] CERTIFY;[05] VERIFIED CORRECTIVE ACTION 1 AND THE MEASUREMENT TABLE.;[06] ACCOMPLISHED UT THICKNESS INSPECTION IAW NDTM D6-37239 PART 4;51-00-00 PROC 2. LOWEST REMAINING THICKNESS IS .033'. TOOL I.D. ATS2031 E650;[07] LOCATED & DRILLED NEW AFT FLOOR WEB P/N 81205-417A5620U15 BS 1016 TO 1016 +15 LBL 4 TO LBL 25; ALSO SEAL RETAINER; ALSO SEAL RETAINER STRAP P/N 65-46823-35 IAW BOEING DWG# 147A5620 & B737-700 SRM 51-40-02-0G-0;[08] FIGURE 1. OK TO INSTALL NEW PARTS.;[09] VERIFIED CORRECTIVE ACTION ITEM 7-8; OK TO INSTALL.;[10] APPLIED PS 870 C20 SEALANT AT 04 SEP-2022 16:22 UTC I.A.W SOPM 20-50-19 AND SRM 51-40-02-0G-0 AND DWG. 147A5600.;[11] VERIFIED CORRECTIVE ACTION ITEM 10; SEALANT APPLIED AT 16:22 UTC 04-SEP-2022.;[12] INSTALLED NEW PARTS AT BS 1016 TO BS 1016+15' LBL 4 TO LBL 25 WL 208 IAW SRM 51-40-02 AND DWG: 147A5600 ID:0032 REV:B.;[13] VERIFIED CORRECTIVE ACTION #12 AND MEASUREMENT TABLE;[14] VERIFIED STEP 1;[15] COMPLETED STEP 2;[16] UPDATED STEP 2;[17] VERIFIED STEP 2.

More about the Boeing 737-7H4