What was found
LEFT HORIZONTAL STABILIZER LEADING EDGE; INTERNAL #5 RIB CRACK NOTED AT RIVET EDGE HOLE (DOT-223 LHLE5). / [01] REMOVED L/H HORIZONTAL STAB #5 RIB AS PER B737-700 SRM 51-40-02-0G-0;[02] LOCATED AND DRILLED NEW L/H HORIZONTAL STAB AS PER B737-700 SRM 51-40-05-0G-0;[03] REMOVED L/H HORIZONTAL STAB LEADING EDGE #5 RIB AS PER B737-700 SRM 51-40-02-0G-0;[04] LOCATED AND DRILLED NEW L/H HORIZONTAL STAB LEADING EDGE RIB AS PER B737-700 SRM 51-40-05-0G-0;[05] VALIDATED CORRECTED STATEMENTS 3 & 4<BR><BR>OK TO INSTALL NEW UNIT;[06] INSTALLED NEW L/H HORIZONTAL STAB LEADING EDGE #5 RIB AS PER B737-700 SRM 51-40-02-0G-0;[07] REMOVED L/H HORIZONTAL STAB LEADING EDGE #5 RIB AS PER B737-700 SRM 51-40-02-0G-0. LOCATED AND DRILLED NEW L/H HORIZONTAL STAB LEADING EDGE RIB AS PER B737-700 SRM 51-40-05-0G-0. INSTALLED NEW L/H HORIZONTAL STAB LEADING EDGE #5 RIB AS PER B737-700 SRM 51-40-02-0G-0.;[08] [FINAL] VALIDATED STEPS 6 & 7