What was found
MID CABIN FLOORBOARD 241AF HAD COMPOSITE PULLED FIBERS ON UPPER SIDE. EVALUATED AND FOUND DAMAGE TO BE REPAIRABLE IAW SRM 53-00-50-2R-0, REPAIR GENERAL, TABLE 201, REPAIR 1. CLEANED AND PREPPED IAW SRM 53-00-50-2R-1, STEPS 3A, C, E, & F. BONDED REPAIR IAW SRM 53-00-50-2R-1, STEPS 3J - M. TAP TESTED GOOD. REPAIRED THE FLOORBOARD IAW SRM 53-0-50-2R-0, REPAIR GENERAL, AND SRM 53-00-50-2R-1.