Service difficulty report · Intercostal · Boeing 7377H4

Difficulty date
February 11, 2023
Submitted
March 20, 2023
Operation
Air carrier
Aircraft
N216WR
Make and model
Boeing 7377H4
Aircraft serial
32488
Aircraft time
55,381 hours, 33,043 cycles
Part
Intercostal
Condition
Corroded
Location
Zn 200 Fus Top
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CABIN FLOOR SUPPORT INTERCOSTAL BETWEEN 294.5-312 LEFT B/L 12 IS CORODED<[01] INSTALLED EWIS AND FOD PROTECTION ON AREA AS PER AMM 20-60-07-913-801.;[02] PARTIALLY REMOVED DAMAGED CABIN FLOOR SUPPORT INTERCOSTAL BETWEEN 294.5-312 LEFT B/L 12 PER REF SRM 51-40-02-0G-0.;[03] VERIFIED STEPS 1 AND 2;[04] REMOVED DAMAGED CABIN FLOOR SUPPORT INTERCOSTAL BETWEEN 294.5-312 LEFT B/L 12 PER REF SRM 51-40-02-0G-0.;[05] VERIFIED STEP 4;[06] OK TO LOCATE AND DRILL HOLES;[07] LOCATED AND DRILLED NEW HOLES ON NEW CABIN FLOOR SUPPORT INTERCOSTAL AS PER SRM 51-40-05-0G-0;[08] VERIFIED STEP 1;[09] OK TO TREAT AND PRIME PART;[10] TREATED AND PRIMED PART PER AMM 51-21-41-370-803 AND AMM 51-21-72-370-804.;[11] VERIFIED STEP 10;[12] OK TO INSTALL INTERCOSTAL;[13] PARTIALLY INSTALLED INTERCOSTAL AS PER SRM 51-40-02-0G-0.;[14] COMPLETED INSTALLATION INTERCOSTAL BETWEEN 294.5-312 LEFT B/L 12 REF. BOEING 737 SRM 51-40-02-0G-0;[15] VERIFIED INSTALLATION OF INTERCOSTAL;[16] REMOVED EWIS AND FOD PROTECTION ON AREA AS PER AMM 20-60-07-913-801.;[17] VERIFIED STEP # 16 JOB IS COMPLETE.

More about the Boeing 737-7H4