What was found
CUSTOMER REQUEST: R/H STA-663 VAPOR BARRIER CRACKED.<[01] MEASUREMENTS;[02] CLEANED AND PREPARED CRACK DAMAGE AREAS FOR REPAIR; STOP DRILL ALL CRACKS ;PERFORMED DRY OUT; FOUND NO WATER AS PER B737 SRM 51-70-04-2R-10;[03] REPAIRED R/H STA -663 VAPOR BARRIER AS PER B737 SRM 51-70-04-2R-10 MATERIAL USED PO.1800550 AND PO.1690463;[04] VERIFIED STEP 3.;[05] SUMMARY: REPAIRED R/H STA -663 VAPOR BARRIER AS PER B737 SRM 51-70-04-2R-10 MATERIAL USED PO.1800550 AND PO.1690463 & APPLIED TOP COAT TO VAPOR BARRIOR STA 663 AS PER AMM 51-21-73-370-804;[06] VERIFIED ALL STEPS