What was found
CORROSION FLOOR BEAM LOCATED STA 986.5 AND RBL44 WL208.1 AT AFT GALLEY AREA 2024-123181<[01] TOOL USED ON STEP 4: ULTRASONIC THICKNESS GAUGE; PN: 45MG; SN: 130066701 ; DUE DATE: 09-JUN-24;[02] TOOL USED STEP 11; 12 AND 13: EDDY CURRENT EQUIPMENT; P/N: NORTEC 500D; S/N: N500X11290U021704; DUE DATE: 12 MAR 24.;[03] TOOL USED STEP 16: RADIOMETER/PHOTOMETER; P/N: XRP-3000; S/N: 1753759; DUE DATE: 12 APR 24.;[04] REPLACED EXISTING REPAIR ON FLOOR BEAM LOCATED STA 986.5 AND RBL 44 WL 208.1 AT AFT GALLEY AREA; IAW BOEING EA 24-153-00571 AND EA 24-153-00571 WIP1. SEE INDIVIDUAL SIGN OFF BELOW.;[05] PERFORMED REPAIR ON FLOOR BEAM LOCATED STA 986.5 AND RBL 18 TO RBL 50 WL 208.1 AT AFT GALLEY AREA; IAW BOEING EA 24-153-00571 AND EA 24-153-00571 WIP1. SEE INDIVIDUAL SIGN OFF BELOW.;[06] TASK COMPLETED; RII <BR><BR>SEE INDIVIDUAL SIGN OFFS BELOW