What was found
CORROSION SPOTS ON AFT CARGO COMPARTMENT FLOOR TO SIDEWALL SUPPORT ZEE RAIL B.S. 727+11' - B.S. 807 LBL. 21' W.L. 156.<[01] (FINAL) REMOVED; LOCATED/DRILLED AND INSTALLED NEW L/H ZEE CHANNEL PER B737-700 SRM 51-40-02-0G-0 AND DWG# 146A7500.;[02] (CORRECTION STEP 1) REMOVED; LOCATED/DRILLED AND INSTALLED NEW L/H ZEE CHANNEL PER B737-700 SRM 51-40-02-0G-0; SRM 51-40-05-0G-0 AND DWG# 146A7500.;[03] VERIFIED STEP#2.