What was found
FLOORBOARD SUPPORT CHANNEL CRACKED AT I/B ATTACH POINT AT APPROXIMATELY STA. 540 BETWEEN FLOOR BEAM AT LBL 0.07 TO SEAT TRACK FLOOR BEAM AT LBL 24.82.<[01] REMOVED DAMAGE FLOOR BOARD SUPPORT (BREAK ASSY-PNL) AT ST. 540 BETWEEN FLOOR BEAM AT LBL 0.07 TO SEAT TRACK FLOOR BEAM AT LBL 24.82 IAW SRM 51-40-02.;[02] LOCATED AND DRILLED NEW FLOOR BOARD SUPPORT ( BREAK ASSY-PNL) IAW SRM 51-40-05.;[03] C/W INSPECTION OF C/A #1 AND #2;[04] OK TO INSTALL GIVEN;[05] INSTALLED NEW FLOOR BOARD SUPPORT (BREAK ASSY-PNL);AT STA. 540 BETWEEN FLOOR BEAM AT LBL 0.07 TO SEAT TRACK FLOOR BEAM AT LBL 24.82 IAW SRM 51-40-02.;[06] C/W INSPECTION OF C/A #5