What was found
ENG1 OVHT; ENG2 OVHT; ENG 1&2&APU FIRE HANDLES ILLUMINATED & WHEEL WELL LIGHT ILLUMINATED ON TAKEOFF ROLL WITH ASSOCIATED FIRE WARNING BELLS ON TAKEOFF ROLL (125KT)<[01] R&R ENG & APU FIRE CONTROL PANEL IAW AMM 26-00-01;[02] PERFORMED THE FOLLOWING OPERATIONAL CHECKS OF ENG & APU FIRE CONTROL PANEL:<BR><BR>-FIRE AND OVERHEAT DETECTION SYSTEM - OPERATIONAL TEST; PER AMM TASK 26-10-00-710-801 OPS CHECK GOOD.<BR>-ENGINE FIRE EXTINGUISHING BOTTLE SQUIB - CIRCUIT TEST; AMM TASK 26-21-00-730-801 OPS CHECK GOOD.<BR>-ENGINE FIRE EXTINGUISHING BOTTLE PRESSURE SWITCH CIRCUIT TEST; AMM TASK 26-21-00-730-802 OPS CHECK GOOD.<BR>-APU FIRE EXTINGUISHING BOTTLE PRESSURE SWITCH CIRCUIT TEST; AMM TASK 26-22-00-730-802 OPS CHECK GOOD.<BR>-WHEEL WELL; WING AND LOWER AFT BODY OVERHEAT DETECTION SYSTEM - OPERATIONAL TEST; AMM TASK 26-18-00-710-801 OPS CHECK GOOD.<BR><BR>REMAINING OPERATIONAL SUBTASKS STILL REQUIRED:<BR>-SUBTASK 26-00-01-720-002 (ENG FIRE SWITCH SHUT DOWN)<BR>-SUBTASK 26-00-01-720-004 (APU FIRE SWITCH SHUT DOWN)<BR>-SUBTASK 26-00-01-720-005 (APU SQUIB CIRCUIT TEST);[03] C/W REMAINING OPS CHECKS PER 26-00-01. OPS CHECK GOOD. REMOVED AND REPLACED APU AND ENGINE FIRE DETECTION CONTROL MODULE IAW AMM 26-10-01. OPS CHECK GOOD.