What was found
THE RT A/C BAY VAPOR BARRIER ATTACH ANGLE, BS 663, RBL 9 CRACKED. ACCOMPLISHED HFEC INSPECTION OF THE DAMAGED AREA & VERIFIED THE CRACK IAW NDT MANUAL PART 6, 51-00-00, PROCEDURE 23. REMOVED & REPLACED THE VAPOR BARRIER ATTACH ANGLE IAW SRM 51-40-02. TANK SIDE FASTENERS DOME SEALED IAW SOPM 20-50-19. DOME SEALED EXTERIOR FASTENERS IN RT A/C BAY & RT WHEEL WELL AREA IAW SOPM 20-50-19. COMPLETING THE INSTALLATION OF THE RT VAPOR BARRIER ATTACH ANGLE. IAW SOPM 20-50-19.