What was found
HFEC VERIFIED BS 663 VAPOR BARRIER ATTACH ANGLE CRACKED APPROX. RBL 9. REMOVED ALL FASTENERS ON R/H VERTICAL FLANGE IN REPAIR AREA STA 663 RBL 5 TO RBL 16 IAW SRM 57-10-10-2R-5. CUT AND REMOVED DAMAGED SECTION OF RH VAPOR BARRIER ATTACH ANGLE FROM RBL 5 TO RBL 17 PER SRM 57-10-10-2R-5. LOCATED AND DRILLED REPLACEMENT RT VAPOR ANGLE ATTACH ANGLE SECTION FROM RBL 5 TO RBL 17, BEGAN FABRICATING REPAIR DOUBLER, AND LOCATED AND DRILLED VERTICAL FASTENER HOLES AND 3 OF THE 6 FUEL TANK FASTENER HOLES PER SRM 57-10-10-2R-5.24. REPAIRED STA. 663 VAPOR BARRIER ATTACH ANGLE FROM RBL 5 TO RBL 22 PER SRM 57-10-10-2R-5; EA-M-25-157-00244 (TTG8Q01BK8BU); AND EA-M-24-157-02340 (TTG8Q01BK8BX).