What was found
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME DENTED AT BS 727A PLUS 16 TO 19 AT S20L. INSTALLED DOUBLER REPAIR PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED D-CHECK, FOUND FUSELAGE FRAME DENTED AT BS 727A PLUS 16 TO 19 AT S20L. INSTALLED DOUBLER REPAIR PER BOEING SRM.