What was found
DURING SCHEDULED SV CHECK, FOUND STRINGER CORRODED AROUND FASTENER HOLES FROM BS 360 TO BS 420, WL 305. REPAIRED PER BOEING SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED SV CHECK, FOUND STRINGER CORRODED AROUND FASTENER HOLES FROM BS 360 TO BS 420, WL 305. REPAIRED PER BOEING SRM.