What was found
DURING SCHEDULED 1/2D CHECK, FOUND FWD SERVICE DOOR FRAME CRACKED IN AFT LOWER CORNER. REPAIRED FRAME PER BAC DRAWING.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED 1/2D CHECK, FOUND FWD SERVICE DOOR FRAME CRACKED IN AFT LOWER CORNER. REPAIRED FRAME PER BAC DRAWING.