What was found
LEFT WING INBOARD GROUND SPOILER INNER SPAR PITTED (C-CHECK RO 3/9/2024) REMOVED CORROSION ON THE LH INBD GROUND SPOILER INBD AND OTBD LANDING AND SUPPORT CHANNELS (INNER SPAR). FOUND INBD CHANNEL OUT OF LIMITS AND OTBD CHANNEL WITHIN LIMITS REF CRJ 200 SRM 57-51-31. REMOVED & INSTALLED A NEW INBD GROUND SPOILER LANDING AND SUPPORT CHANNEL REF DWG 601R10224 REV L REF CRJ 200 SRM 51-42-06. LH INBD GROUND SPOILER REPLACED, ORDERED & RECEIVED ON CAMP #27683033. ALL CHECKS GOOD. COMPLIED WITH SKYWEST TASK CARD 51-900-1003-SKY. SEE CONTINUATION FOR FURTHER DETAILS.